Five years after the electricity connections wandering
A yr ago, orders for depositing the demand quantity of 1/2 a dozen chains were withdrawn. The amount changed into deposited with the aid of the farmers. Despite this, the strong connection turned into not determined. There also are no electric poles in lots of chains. Madan Soyaran of Chak 9 ADV told that he had applied on February 4, 2014, inside the call of Premarin, Ramuram, Chanduram, Maharam, Lalchand, who had deposited hundred rupees inside the call of the member and 6 In March 2018, the call of every member became deposited in the quantity of Rs. Three thousand seven-hundred rupees to accumulate Rs. 18 thousand 500 rupees. In spite of this, electrification work becomes no longer achieved of their structures to date. He said that for five years the officials are misguiding no excellent solution. On the identical day, inside the call of Imilal, Guddi Devi, Meeradevi, in Chuck eight ADY eleven thousand 100 rupees on 14 June 2018, Chak 4-5 AM, Palaram, Ridalalam, Chunaram, Nankarram, Chetaram, 20 June 2018 to 18 thousand 500 rupees, In the name of Chak 10 BSM resident Ramlal, Amilal, Devilal, Syopratam, deposited a call for quantity of 20 thousand rupees on May 11, 2018.
After depositing the demand amount, the farmers are feeling slighted due to loss of energy connection. The Central Government has ordered to do special work of BADP and Deendayal scheme to connect the disadvantaged structures, however, officers of the department are not paying attention. This is a massive proportion of farmers.
No comments:
Post a Comment